Unified project context

San José project intelligence

Major private developments and city capital-improvement projects can help a trade or supplier understand what is forming around a territory. These are context records, not guaranteed leads, permit approvals, or owner-contact enrichment.

Join confidence

A project record is not automatically a permit record.

PermitWire preserves each source's own identity and reports join confidence. A shared APN or source-supplied planning reference is context until a lifecycle backtest validates the relationship; no project card creates a building-permit alert by itself.

Public source inventory

40 current project records

City GIS sources
Capital improvementCurrent source row

Miscellaneous Sanitary Sewer Repairs FY 2024-2025 Package III

This project was developed from the Department of Transportation’s sanitary sewer overflow related issues and from video inspections showing severe pipe defects to assist in reducing the city’s sanitary repair back-log. The work under this contract consists generally of, but is not limited to, removal and replacement of approximately 425 linear feet of 6-inch vitrified clay pipe (VCP), installation of approximately 355 linear feet of 10-inch VCP, installation of approximately 130 linear feet of 6-inch VCP, and installation of approximately 305 linear feet of 6-inch cured-in-place pipe (CIPP) liner. This project includes removal and replacement of 5 existing manholes; construction of 4 new manholes; rehabilitation 5 of manholes; point repairs to an existing 6-inch VCP; abandonme...

Status
Phase V - Construction
Address
Stockton Ave, Almaden Rd, Hillsdale Ave, and Old Tully Rd.
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Miscellaneous Sanitary Sewer Repairs FY 2025-2026 Package II

This project generally involves evaluating the condition of seven selected 6-inch, 8-inch, and 10-inch diameter vitrified clay pipe (VCP) sewer segments, totaling approximately 2,615 linear feet. Open-trench point repairs will be performed as needed prior to the installation of approximately 2,245 linear feet of cured-in-place pipe (CIPP) liner. Approximately 370 linear feet of VCP will be removed and replaced with ductile iron pipe (DIP).

Status
Phase IV - Bid/Award
Address
Magnolia Ave, E San Antonio St, E Julian St, Olive Ave, Willow St, Mt Stanley Way
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Ridder Park Drive Pump Station Improvements

The project will replace the hatch and guide rails at the Ridder Park Pump Station.

Status
Phase III - Design
Address
Fox Lane and Ridder Park Drive
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Sanitary Sewer Repairs FY 2026-2027 Package V

The City of San Jose Department of Public Works has developed an Exfiltration Abatement Program Plan. This program focuses on minimizing the risk of wastewater leaking from sanitary sewer pipes and entering into adjacent storm sewer pipes. This sanitary sewer repairs project is part of this program and will consist of repairing and rehabilitating sewer segments that are crossing above or are parallel and within 10 feet of a storm drain. Open trench construction methods will be used to perform necessary point repairs prior to rehabilitating the existing pipes with the Cured-In-Place-Pipe method. The work to be performed under this project consists of: video inspection of 8-inch & 6-inch vitrified clay pipe (VCP) segments (11,650 linear feet), point r...

Status
Phase III - Design
Address
Multiple locations within Council District 5. Street to be impacted: Mt Herman Dr, Mt Palomar Dr, Mt Diablo Dr, Mt Hood Way, Lochner Dr, Murthda Dr, Griffith St, Torrance Ave, Regan St, Vernice Ave, Lancelot Ln, Aramis Dr, Hickerson Dr, Moreno...
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Cast Iron Sewer Replacement FY 2026-2027 Pkg I

The project scope includes the removal and replacement of existing cast iron sanitary sewer pipes with ductile iron pipes, as well as the rehabilitation of manholes.

Status
Phase III - Design
Address
Grand Blvd, Nottoway Ave, Winterberry Way, Colusa Way
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

PARK: Columbus Park Soccer Field

Renovation of Columbus Park, abandoning Spring Street and providing a sports complex with lighting and miscellaneous amenities to support its function.

Status
Phase III - Design
Address
Columbus Park, San Jose
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

PARK: Bassett Street Park

This project will include the construction document and construction of Basset Park. The program will be based on the Bassett Park Master Plan which includes fitness area, climbing wall, seating, flex space and electrical connections and structural foundations for Public Art.

Status
Phase V - Construction
Address
150 Bassett Street
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

PARK: North San Pedro Park

The project will be the preparation of construction documents and construction of a pedestrian-oriented linear park based on the North San Pedro Master Plan. The program includes seating, flexible gathering spaces, lighting and food truck pop-up area.

Status
Phase V - Construction
Address
The North San Pedro Park site includes North San Pedro Street between Bassett Street and West Julian Street.
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

BUILDING: Police Department Training Center Relocation (2018 Measure T)

Existing building of approx. 90,000 sq. ft.. Police Dept. (PD) Training and Academy Center Relocation. Possible Tenant Improvement of an Existing Building.

Status
Phase V - Construction
Address
300 Enzo Drive, San Jose, CA 95138 https://cpms-app.sanjoseca.gov/cip/location/9149
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

PARK: BUNDLE - 9111 North San Pedro Park and 9102 Bassett Park

This project is created for the bidding of North San Pedro and Bassett parks as a bundle. Details for each park can be found at their respective CPMS entries: 9111 - North San Pedro Park and 9102 - Bassett Park

Status
Phase V - Construction
Address
North San Pedro Park is located on the former North San Pedro St. between Bassett St. and West Julian St. Bassett Park is located at 150 Bassett St.
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Spartan Keyes (Brickyard) Park

The project will be the preparation of construction documents and construction of a neighborhood park based on the Brickyard Park Master Plan. The project site includes archaeological resources associated with a historic brickyard. The program includes a playground, multi-purpose sports court, recreational turf area, fitness stations, shaded picnic area and lighting. An existing brick building will remain on site.

Status
Phase III - Design
Address
Northeast corner of Keyes Street and South Third Street.
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

River Glen Park Basketball Court Renovation

This project provides funding to reconstruct the basketball courts at River Glen Park. Project elements include addressing soil composition, which has caused differential settling, demolishing and reconstructing the courts, replacing the basketball poles, backboards, and nets with city standard equipment, and surfacing and striping of the basketball courts.

Status
Phase III - Design
Address
Northwest corner of Pine Avenue & Bird Avenue in San Jose
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

All Inclusive Playground - Camden Park

This project includes replacing the existing playground at Camden Park with an all inclusive playground.

Status
Phase III - Design
Address
3369 Union Ave, north of the Camden Community Center parking lot.
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Saratoga Creek Park Tot Lot Renovation

This project consists of a Tot Lot playground renovation at Saratoga Creek Park. The scope includes cleaning and upgrading the existing play equipment, replacing the wood fiber surfacing, improving the parking lot to accommodate one ADA-compliant parking space, and making other minor improvements.

Status
Phase V - Construction
Address
5293 Hoyet Drive, San Jose, CA 95129
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Outfall #67F & 509 Rehabilitation and Outfall #88F & 1072F/141F Rework

This project entails the rehabilitation of two deteriorated storm sewer outfalls located along the Guadalupe River. Scour has resulted in the erosion of the river banks that has undermined the existing concrete sack rip-rap and outfall (OF) infrastructures. The proposed project will include removal of compromised concrete sack rip-rap, fill and compaction of scour cavities and install new rock slope protection at the two sites. At OF 509, the 66-inch corrugated metal pipe will be replaced with new RCP piping. Damaged pipes at OF 67F will be removed and upsized from 27-inch to new 72-inch RCP. New junction structure will also be constructed with new 72-inch RCP connecting to exist stub out at structure B on Autumn Parkway. New headwalls and wing walls will be constructed for both...

Status
Phase III - Design
Address
1) Outfall #67F at the east end of now abandoned Howard Street, between the railroad tracks and Julian Street 2) Outfall #509 is located on the east bank between W. Taylor Street and Coleman Avenue. 3) Outfall #88F located at Martha Stre...
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

BUILDING: Police Dept. New Air Hangar at SJ Mineta Int. Airport (2018 Measure T)

Construction of a new Police Department facility at San José Mineta International Airport, featuring two hangar bays and a dedicated office area. The project site is located on the southwest portion of the airport property, near the intersection of Coleman Avenue and Airport Boulevard, immediately south of the recently completed ARFF/FS20 facility. This development is designed to enhance operational readiness, improve response capabilities, and support the department’s growing needs within the airport environment.

Status
Phase V - Construction
Address
1114 Coleman Avenue, San Jose, CA 95110
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

BUILDING: Emergency Interim Housing at VTA Cerone Bus Yard

Initiated as part of the State's Tiny Homes program, this project will provide interim housing for up to 200 beds (162 units), ancillary buildings (kitchen, laundry, case management, and restrooms), utilities, lighting, parking, and other community amenities. The City has entered into an agreement with the State to receive $13,261,618 in State funding to deliver at least 200 beds at the Cerone site by July 31, 2025.

Status
Phase V - Construction
Address
3950 Zanker Rd, San Jose, CA 95134
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

1300 Berryessa Safe Parking

This project will construct a Supportive Parking facility for up to 86 RVs and provide supportive facilities including administrative and case management offices, laundry, and showers. Site improvements will include fencing, gates, parking for standard vehicles, paved flexible use space, striping, signage, portable office and miscellaneous site amenities.

Status
Phase V - Construction
Address
1300 Berryessa Road, San Jose, CA 95133
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Turnkey Park - Seely Avenue

Turnkey Park that includes but is not limited to: Large turf lawn area, children’s play areas, including elements appropriate for 2-5 and 5-12 years of age, Historic interpretative plaza. Thematic design elements that are reflective of the history of the site. A dog park with separate areas for large dogs and small dogs. A public plaza, pollinator gardens, pickleball courts, pedestrian and bike paths and outdoor fitness area.

Status
Phase III - Design
Address
125 Sakauye Park Drive
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Turnkey Park - Facchino Park

The scope of work includes the construction of a wetland park that includes educational programs, DG fitness loop, seating areas and bicycle parking spaces.

Status
Phase III - Design
Address
1655 Berryessa Rd, San Jose, CA 95133
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

PARK: Palmia Park Tot Lot Renovation

Scope of work includes complete replacement of the existing tot lot at Palmia Park. The tot lot project scope includes the demolition of outdated play equipment and installation of new play equipment geared towards the recreational needs of the community.

Status
Phase III - Design
Address
Primrose Drive & Palmia Drive, San Jose, CA 95123
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

TURNKEY PARK: Communication Hill Dog Park - Phase 3

A large and small fenced dog park with double gate entry systems. The scope also includes site furnishings including tables and chairs, trash receptacles, benches, and bike racks.

Status
Phase III - Design
Address
Communication Hill Boulevard & Joseph Borba Street
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

TURNKEY PARK: Communication Hill Phase 4 - Azevedo Park

Scope includes a large central turf area, concrete circulation paths, granitecrete and concrete plazas, as well as site furnishings. Park will also include new planting and irrigation.

Status
Phase III - Design
Address
Thomas Kell Place and Kell Ranch Street
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

New Generators and BESS at CSY EOC and FTC

This project involves the design and installation of a new generator for the Fire Training Center buildings, as well as the replacement of the existing generator for Building A at the Central Service Yard.

Status
Phase VI - Post Construction
Address
1591 / 1661 Senter Rd, San Jose, CA 95112
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Seven Trees Community Center Chiller Replacement

The project scope is to replace the existing water-cooled chiller with a new chiller of a similar type and cooling capacity, located at the Seven Trees Library and Community Center.

Status
Phase VI - Post Construction
Address
3590 Cas Dr., San Jose, CA 95111
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

San José Museum of Art Cooling Tower Replacement

This project includes the replacement of the existing cooling tower and condenser water pumps, along with waterproofing of the mechanical room floor to ensure reliable and safe operation of the facility.

Status
Phase VI - Post Construction
Address
110 S Market St, San Jose, CA 95113
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Convention Center Fire Alarm System Upgrade

The project includes the design and construction for the new fire alarm panels, initiating and notification devices, and upgrade of conduits and cables.

Status
Phase III - Design
Address
150 W. San Carlos Street, San Jose, CA 95113
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

San Jose Civic Center and Montgomery Theater Fire Alarm System Upgrade

The project includes the design and construction for the new fire alarm panels, initiating and notification devices, and upgrade of conduits and cables.

Status
Phase III - Design
Address
Civic Auditorium: 135 W San Carlos St, San Jose, CA 95113 Montgomery Theater: 271 S Market St, San Jose, CA 95113 McCabe Convention Hall: 145 W San Carlos St, San Jose, CA 95113
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Regional Wastewater Facility Elevators Modernization

A comprehensive modernization is planned for Elevators ID 78, 79, and 80. Elevator ID 78, which serves as the freight elevator, and Elevators ID 79 and 80, which are passenger elevators, will undergo a full capital upgrade to enhance reliability, safety, operational performance, and overall appearance, while ensuring compliance with current codes and standards. The scope of work includes the replacement of existing controls, hydraulic power units, and hydraulic cylinders, along with modernization of door equipment and operating systems. The project will also include new fixtures, upgraded cab interiors, and upgrade of cab ceilings and flooring finishes. Associated electrical improvements will be undertaken, including new wiring and lighting upgrades. In addition, the elevators ...

Status
Phase III - Design
Address
The Project is at the Regional Wastewater Treatment Plant, located at 700 Los Esteros Rd. San Jose, CA 95134.
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Police Communication Building Emergency Generator Replacement

This project involves replacing two backup generators at the Police Communication Building. These generators provide essential emergency power to all critical operations, including the 911 Dispatch Center, ensuring uninterrupted service during power outages and other emergencies.

Status
Phase I - Project Feasibility
Address
855 N San Pedro St, San Jose, CA 95110
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Police Administration Building Gun Range Ventilation System Upgrade

The project involves upgrading the existing gun range ventilation system at the Police Administrative Building to improve system performance and meet applicable requirements.

Status
Phase I - Project Feasibility
Address
PAB - 201 W Mission St, San Jose, CA 95110
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Fire Training Center and Emergency Operation Center HVAC Improvements

The project includes an evaluation of the existing heating, ventilation, and air conditioning (HVAC) systems at the City’s Emergency Operations Center and Fire Training Center to assess their condition, performance, reliability, and operational needs. Based on the evaluation, the project will include the design of HVAC system replacements and recommended improvements to enhance system reliability, energy efficiency, and long-term functionality. These improvements will support safe, reliable, and uninterrupted operations at both facilities.

Status
Phase III - Design
Address
1591 Senter Road, San Jose, CA 95112 https://cpms-app.sanjoseca.gov/cip/location/10671
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Digital Billboards - Outfront Foster Media

This project is to manage the vendor to install one standalone freeway facing billboard in City of San Jose, 385 Willow Street.

Status
Phase III - Design
Address
385 Willow Street San Jose CA
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Digital Billboards - Clear Channel Media

This project is to manage the vendor to install two standalone billboards in City of San Jose, 211 Asbury and 1404 Mabury Rd.

Status
Phase V - Construction
Address
211 Asbury St, San Jose, CA, 95110 1404 Mabury Rd, San Jose, CA, 95133
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Convention Center Ballrooms and Meeting Rooms Lighting Upgrade

The project involves upgrading the lighting and lighting control systems in the ballrooms and meeting rooms at the San Jose Convention Center to enhance functionality, efficiency, and overall visitor experience.

Status
Phase III - Design
Address
SJCC - 150 W San Carlos St, San Jose, CA
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Center for the Performing Arts Chiller, Cooling Tower, and Boilers Replacement

The project at the Center for Performing Arts will upgrade critical building systems to improve reliability, energy efficiency, and overall performance. The work includes replacing the cooling system (water-cooled chiller, cooling tower, chilled water and condenser water pumps, controls, and accessories), the heating system (boilers, hot water pumps, controls, and accessories), and the main electrical switchboard. These upgrades will help ensure a comfortable environment for visitors and staff while supporting the long-term operation of the facility.

Status
Phase V - Construction
Address
255 Almaden Blvd. San Jose, CA 95113
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

PAB and PAC Plumbing Upgrade

Upgrade of the plumbing system for 25 bathrooms at Police Administration Building (PAB) and Police Administration Communication Building (PAC) by replacing existing plumbing fixtures, trap primers, and floor drains, cleanouts above each urinal, wall carriers, wall-mounted water closet; and adding new isolation valves, and wall access panels where trap primers and shut off valves, etc. Additionally, the shower room in the Men's locker room on the 3rd floor of the PAC will be fully reconfigured and renovated; approximately 40 feet of an existing exterior underground sanitary sewer line will be replaced; all supply and exhaust air registers in all bathrooms will be cleaned; and several air registers in bathrooms will be replaced.

Status
Phase III - Design
Address
PAB - 201 W Mission St, San Jose, CA 95110 PAC - 855 N San Pedro St, San Jose, CA 95110
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Digital Billboards - Orange Barrel Media

Public Works is coordinating the installation of 5 digital billboards in partnership with Orange Barrel Media, on four downtown buildings: Center for the Performing Arts, 2nd Street and San Carlos Garage, Market and San Pedro Square Garage, and Convention Center. City staff will provide a range of support services, including (but not limited to) project coordination, review of electrical, structural, and civil designs and permits, permitting assistance, construction support, responses to RFIs, inspections, oversight of third-party special inspection contracts, and project close-out activities.

Status
Phase V - Construction
Address
255 S Almaden Blvd, San Jose, CA 95113 150 W San Carlos St, San Jose, CA 95113 45 N San Pedro St, San Jose, CA 95113 280 S Second St, San Jose, CA 95113
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied

Capital improvementCurrent source row

Convention Center HVAC Control Upgrades

The project is to upgrade the Convention Center HVAC controllers and to provide a new Building Management System (BMS). The Convention Center will be upgraded to the industrys most advanced standards, BACnet IP protocol, and the controllers.

Status
Phase V - Construction
Address
408 Almaden BlvdSan Jose, CA 95110
Source reviewed
Oct 30, 2026
Retrieved
Nov 29, 2026
Source identity 100%Permit join 20%

source only · No APN supplied